Master cartons stacked inside a shipping container at an export warehouse

Almost every importer negotiates the FOB price and then accepts the freight bill as a fact of nature. Freight is not a fact of nature. It is a physical consequence of your carton dimensions, your density, and the mode you picked — three things you control.

A container is a box with known internal dimensions. Your product is a set of cartons with known dimensions. The distance between what fits and what you actually ship is pure margin, and it is usually between five and fifteen percent of the box.

The one-line version: fill rate is a design decision made before the PO, freight mode is arithmetic you should run before you book, and both are checkable on a calculator in ten minutes. Sellers who skip those ten minutes pay for it on every shipment for the life of the product.

1. Nominal volume versus what you can actually load

Container capacity is usually quoted as one number, and it is the wrong number to plan with. Nominal volume is a geometric maximum. Real loading leaves gaps: cartons do not tessellate perfectly, pallets ignore the last thirty centimetres, doors are narrower than the box, and nobody hand-stacks the top corner.

ContainerInternal length × width × height (approx.)NominalPlanning fillPayload
20GP5.90 × 2.35 × 2.39 m~33 CBM25–28 CBM~28 t nominal
40GP12.03 × 2.35 × 2.39 m~67 CBM55–58 CBM~28 t nominal
40HQ12.03 × 2.35 × 2.70 m~76 CBM65–68 CBM~28 t nominal
45HQ13.55 × 2.35 × 2.70 m~86 CBM72–76 CBM~27 t, not legal everywhere in the US

Internal dimensions are standard published specs and vary slightly by builder — planning numbers, not survey data. Two consequences follow.

Planning fill is roughly 85–90 percent of nominal. A 40HQ does not hold 76 CBM of cartons; it holds about 66. Divide your container rate by nominal volume and you under-forecast cost per CBM by a seventh.

The 40GP-to-40HQ height jump is nearly free for bulky goods. Roughly nine extra cubic metres on the same footprint, usually for a small premium. For plush, bedding, packaging-heavy home goods and flat-pack furniture, take the high cube. For dense cargo that hits the weight limit first, the extra height buys nothing.

2. Which limit binds: volume or weight

Work out which constraint you hit first, because it changes the whole conversation.

Volume-bound cargo — stuffed toys, decor, low-density goods. You run out of cubic metres long before tonnes, so carton geometry is everything: tiers that stack, floor area a footprint wastes, cartons per pallet layer.

Weight-bound cargo — hardware, ceramics, liquids, batteries, metal fittings. You hit payload with the box half full, and no stacking improvement recovers the air.

The road limit is often lower than the box limit. In the United States, gross vehicle weight rules cap a 40HQ moving by truck well below its structural payload. For dense cargo, ask your forwarder for the realistic legal payload on the specific lane, not the nameplate figure. This is also where verified gross mass rules matter: VGM under SOLAS is not paperwork theatre, it is why overweight boxes get rolled or refused at the terminal.

3. FCL versus LCL: the break-even is a density question

Most sellers choose between FCL and LCL by carton count. Carton count tells you almost nothing. The variable that matters is revenue tons.

LCL prices per revenue ton, where one revenue ton is one cubic metre or one metric tonne — whichever is greater. That single line explains nearly every surprise on an LCL invoice:

  • Light, bulky cargo pays twice. A cubic metre of plush weighing 60 kg charges as a full cubic metre while occupying space a denser shipper would have paid more for.
  • Dense cargo pays by weight. Ceramic tile charges on tonnes — but you only fit a fraction of the container because payload binds first.
  • Fixed charges dominate small shipments. Documentation, CFS handling, terminal and destination fees are per-shipment, not per-CBM. On a three-CBM shipment they rival the freight itself.

LCL also carries costs that never appear on the rate card. Your cargo is co-loaded with other shippers' goods, which means more handling, more damage exposure to the cartons, and more risk that a co-loaded container is held for inspection. Your delivery date becomes a function of when everyone else's cargo was ready.

Watch the destination side. The quote that looks cheapest per CBM is often the one with the thinnest origin rate and the fattest destination stack. Ask for an all-in door-to-door number with every charge named, and compare totals, not unit rates.

4. Running the break-even on the back of an envelope

The rates below are illustrative and deliberately round. They are not a quote, and 2026 pricing on any lane will differ. The arithmetic is the point.

LineLCL (per shipment)20GP (per container)
Ocean freight$85 per revenue tonIncluded below
Origin handling / CFS~$120 fixed + $12/CBMIncluded
Documentation & export clearance~$180 fixed~$220 fixed
Destination fees (THC, CFS, D/O)~$95/CBM + fixed charges~$450 fixed
Illustrative all-in~$200 + $190 per CBM~$2,400
Break-even(2,400 − 200) ÷ 190 ≈ 11–12 CBM

Eleven or twelve cubic metres is roughly a third of a 20GP. That is the number that surprises people: the crossover is usually far lower than "when I fill a container", because LCL fixed charges are heavy and the per-CBM charges stack on top of them.

The formula is unglamorous: take the fixed portion of the LCL all-in, subtract it from the FCL all-in, divide by the LCL variable rate per CBM. If expected volume exceeds the result, book the container — even shipping it a third empty, because the empty third costs less than the fixed charges you avoid.

Two refinements before you commit: check whether your LCL shipment charges on volume or weight, since minimums apply, and compare door-to-door rather than port-to-port — an FCL needing drayage plus a warehouse appointment can lose its edge against an LCL landing at your 3PL's dock.

5. The two-centimetre rule: carton dimensions are worth real money

This is where sourcing and freight meet, and for bulky product it is the largest single lever in the file.

A master carton has three dimensions and a stack pattern. Change any of them slightly and the number of cartons that fit changes in jumps, not smoothly — because cartons must land on whole multiples of each other.

Work an example. A carton of 60 × 40 × 40 cm is 96 litres. Along a 12.03 m container length you fit 20. Across 2.35 m you fit five at 40 cm, wasting 35 cm. A 40HQ allows six tiers at 40 cm with 30 cm of headroom. That is 20 × 5 × 6 = 600 cartons, or about 57.6 CBM against a 76 CBM box — roughly 76 percent fill, with the waste concentrated in the width and the top.

Now trim to 58 × 38 × 38 cm. Same product, slightly tighter packaging. Length still fits 20; width now fits six (6 × 38 = 228 cm); height allows seven tiers (266 cm inside 270). The result is 20 × 6 × 7 = 840 cartons — 40 percent more units in the same container, for the cost of a die-line change and a compressed inner arrangement.

The same principle runs in reverse. A carton two centimetres too wide to fit six across costs you a sixth of your container, permanently, on every shipment, for as long as the product exists. Nobody at the factory flags it, because from their side the carton is fine: it fits a pallet, clears their door, and protects the product.

That asymmetry is why loadability belongs in your specification. The factory optimises the carton for carton cost — board area, die cutting, standard sizes it already buys. You need it optimised for container fill. Only the buyer can decide which wins.

6. The constraints that fight against fill rate

ConstraintPushes you towardHow to reconcile
Marketplace carton limits (Amazon caps standard master cartons at 50 lb / 25 in on the longest side — confirm against the current prep manual)Smaller, lighter cartonsSize to the limit, then re-run the load math
Drop and compression testingThicker board, more void fillFix internal packing first, then reduce board grade until tests say stop
Pallet footprint (120 × 100 cm, or 48 × 40 in GMA)Cartons in multiples of the palletChoose dimensions that divide the pallet and the container width
Retail case-pack rules (6, 12, 24)Fixed carton countsHold the count, adjust internal arrangement, not outer dimensions
Handling weight for warehouse staffCartons under roughly 20 kgSplit into two cartons that still stack efficiently
Container door openingCartons that pass through on a palletCheck loaded pallet height, not carton height

The pallet conflict is the most expensive and the easiest to miss. A carton designed for a 120 × 100 cm pallet may fit nine per layer with no overhang — while leaving half a metre of dead space across a 235 cm container width. Every layer of dead width, multiplied by every tier, is volume you bought and did not use.

7. Palletised or floor-loaded?

Pallets exist because someone downstream — a 3PL, a retail DC, a marketplace inbound programme — needs to move the goods with a forklift. That is legitimate and it has a price: the pallet's own height, the void above it, and the unusable strip where the footprint does not divide the container.

Roughly, palletising a container that could be floor-loaded costs several cubic metres of capacity plus the pallet cost, in exchange for faster unloading. If the requirement comes from a document, follow it. If it comes from a habit, price it — a pallet spec costing six percent of container capacity is a six percent freight increase per unit, forever.

  • Palletise when the buyer demands it. Retail DCs and marketplace inbound usually have a rule. Do not fight it; specify the exact pallet standard so your factory builds cartons to that footprint.
  • Floor-load when you ship to your own 3PL and it handles loose cartons. Cheapest per unit, and the reason a well-designed carton can carry ten to fifteen percent more product than a palletised equivalent.
  • Slip-sheet or pallet-exchange models split the difference: goods ship floor-loaded, the receiver palletises on arrival. Ask your 3PL before assuming pallets are mandatory.

8. Supervision and the loading plan

Loading is where a good carton spec gets thrown away by a warehouse team racing a terminal cut-off. Two artefacts prevent that.

A loading plan. One page drawn from your carton dimensions: cartons per layer, layers, total cartons, where the last partial bay goes, single or mixed SKU, expected CBM and gross weight. Your factory should confirm it in writing before the container arrives. If their plan says 640 cartons and your arithmetic says 700, you have found the gap before it becomes a rolled shipment.

A stuffing photo set. Empty container with the number visible, first three layers, mid-load, final row at the doors, door seal, and the packed carton count on the loading tally. Not paranoia — it is how you settle a shortage claim, prove damage was pre-existing, and discover the factory has been shipping forty cartons fewer than invoiced.

For multi-supplier shipments the loading plan gets harder and more valuable at once, because you sequence factories into bays instead of filling with one SKU. The mechanics are in multi-supplier container consolidation; the cost side of the same shipment is laid out in freight options, costs and timelines.

9. What to write on the purchase order

Loadability dies in the gap between sample approval and running order, because the carton is usually approved as a picture rather than a specification. Close it with clauses, not conversations.

  1. Carton dimensions with a tolerance. Outer dimensions in millimetres, typically ±5 mm per dimension, and no board-grade substitution without written approval. Without a tolerance, "close enough" is compliant.
  2. QTY/CTN and total carton count. Both numbers, not just total units. The carton count is what you load against.
  3. Loadability statement. "Factory confirms X cartons load into one 40HQ floor-loaded, stacked Y high, with a loading plan submitted for buyer approval before stuffing." One sentence converts an assumption into an obligation.
  4. Shipping marks and label spec, including marketplace labels where relevant, applied in China rather than at a destination prep centre.
  5. Stuffing photos and loading tally as delivery documents, listed beside the packing list and commercial invoice. Read the carton-level format requirements in the import documents guide, because your broker will want them to reconcile.

On FOB terms your control over loading ends when the container is gated in — so the loading plan and photo set have to happen at the factory, before that point, or not at all. The cost consequences of that handover are in the Incoterms guide.

10. The mistakes that repeat

MistakeWhat it costsFix
Planning on nominal container volume10–15% under-forecast per unitPlan on 65–68 CBM for a 40HQ, 55–58 for a 40GP
Choosing LCL by carton count, not densityFixed LCL charges on shipments that should have been a containerRun the fixed-plus-variable worksheet at expected volume
Approving the carton from a photoA dimension that fits nothing, locked in for the product's lifeApprove dimensions in millimetres and re-run the load math before tooling
Palletising by habitSeveral CBM lost per container, plus pallet costPrice it; follow if documented, question if not
No loading plan or photo setUnwinnable shortage and damage claimsMake both delivery documents on the PO
Ignoring legal payload on the destination laneRolled box or trucking surchargeGet lane-specific legal payload before booking dense cargo

11. The ten-minute audit before your next booking

Confirm carton outer dimensions in millimetres from the approved sample, not the quotation sheet.
Calculate cartons per layer against container width, then tiers against internal height. Multiply for your real load.
Convert to CBM and gross weight, then check which limit binds first.
Compare that load to the factory's stated capacity for the same container. A gap over five percent deserves a question.
Run the LCL break-even on your own fixed and variable rates.
Decide palletised or floor-loaded and write the decision into the PO with the standard named.
Request the loading plan before stuffing and the photo set after.
Recheck the landed-cost model with the real freight figure — duty and customs value sit on top of it, as covered in customs clearance and landed cost.

The Bottom Line

Freight is the last lever in a China import that still moves after everything else is signed. The FOB price gets locked by negotiation, the duty rate by tariff code, the compliance cost by category — but the number of units in a container is set by a carton dimension you approved, probably from a photograph, probably when changing it was cheap.

Run the arithmetic before the die-line. Ten minutes with a calculator, once per product, is worth more than most sellers ever extract from a second round of price negotiation.

Get the sourcing numbers right the first time

The China Sourcing Guide walks through the full cost model — FOB, freight, duty, landed cost — with the worksheets I use on live orders. Free to start.

Start with the free sourcing guide